D

Protocol library.

Installable day systems for the moments that usually break the baseline.

Protocol stack

Four ways the baseline adapts.

Founder Cut, Crisis Day, Travel Day, and Recovery Week are concrete operating modes, not static advice.

Body recomposition

Founder Cut

A baseline for operators cutting noise without losing work capacity.

Protein, steps, lift signal, sleep debt
Fallback mode

Crisis Day

A minimum viable day when travel, deadlines, or family pressure break the plan.

Three anchors, one meal rule, stack rescue
Continuity protocol

Travel Day

Keep the baseline intact when airport food, time zones, and missed sessions hit.

Swaps, hydration, walking, late training
Repair cycle

Recovery Week

A calmer operating mode for fatigue, soreness, inflammation, and return to rhythm.

Sleep, soreness, Mirror, load reduction
Practice

Normal Day is the anchor

Product

Deviation-first logging

Mirror

The Mirror layer

Review

The Weekly Board Report

Studio

Studio protocol systems

Start baseline